Kennedy Expressway (I-90/I-94) Bridge Rehabilitation Project
Chicago, IL · 2023–2025
- Client
- Illinois Department of Transportation (IDOT) District 1
- Owner
- IDOT District 1
- Location
- Chicago, IL
- Year
- 2023–2025
Project Overview
Description
HBM led Phase II Engineering Services for the Northbound & Reversible I-90/94 Mainline Bridge Deck Overlay & Joint Repair and Roadway Pavement Patching Project. The initiative rehabilitated 63 total bridge structures across three corridors (23 Inbound, 21 Reversible, 19 Outbound) between Ohio Street and the I-90/I-94 split, with project efforts totalling approximately $150 million.
HBM's Scope
Scope of Work
- Phase II Engineering Services for 19 bridges in the Northbound I-90/94 Mainline
- Plans, special provisions, and detailed construction estimates
- Maintenance of Traffic implementation
- Pavement patching coordination
- Sign structure replacement
- Project lifecycle management and Value Engineering Study incorporation
- Phase III Engineering Support and RFI responses
- Repairs to 36 bridges, overhead sign-structure replacements, LED lighting upgrades, new signage, structural painting, and REVLAC (Reversible Lane Access Control) system rehabilitation
- Bridge counts by corridor: I-90/I-94 Inbound (SB) — 23 bridges; Reversible — 21 bridges; Outbound (NB) — 19 bridges
Highlights
Project Highlights
- Critical bridges including SN 016-0133 over Ashland Avenue, SN 016-0135 over Division Street, and SN 016-0111 over Kostner Avenue
- Coordination across multiple contracts and contractors