Demolition
ComEd Bridge #167 over W Deerpath Road – Demolition
Lake Forest, IL · 2022
- Client
- Omega III, LLC
- Owner
- Omega III, LLC
- Location
- Lake Forest, IL
- Year
- 2022
Project Overview
Description
Demolition procedure development for ComEd Bridge #167 spanning West Deerpath Road.
HBM's Scope
Scope of Work
- Demolition procedure
- Site safety analysis
- Roadway protection
- Demolition plan for ComEd Bridge #167 in Lake Forest, Illinois, located near an in-service railroad bridge
- Bridge: single span; length 50'-0", width 31'-4", skew 0 degrees; concrete deck, ballast, steel bedding, transverse floorbeams, built-up steel riveted plate girders, and W-shape steel fascia beams with embedded arches
- Equipment: 87K-pound excavator (CAT 336), 40K loader, skid steer
- Structural Analysis: Load Factor analysis using MDX software; adequacy confirmed for the 87-kip excavator; lead-paint precautions; road closure with traffic detour
Services Provided
Demolition Engineering
Primary Discipline
Research and Testing
Categories