Skip to main content

Demolition

ComEd Bridge #167 over W Deerpath Road – Demolition

Lake Forest, IL · 2022

Client
Omega III, LLC
Owner
Omega III, LLC
Location
Lake Forest, IL
Year
2022
ComEd Bridge #167 over W Deerpath Road – Demolition — Lake Forest, IL

Project Overview

Description

Demolition procedure development for ComEd Bridge #167 spanning West Deerpath Road.

HBM's Scope

Scope of Work

  • Demolition procedure
  • Site safety analysis
  • Roadway protection
  • Demolition plan for ComEd Bridge #167 in Lake Forest, Illinois, located near an in-service railroad bridge
  • Bridge: single span; length 50'-0", width 31'-4", skew 0 degrees; concrete deck, ballast, steel bedding, transverse floorbeams, built-up steel riveted plate girders, and W-shape steel fascia beams with embedded arches
  • Equipment: 87K-pound excavator (CAT 336), 40K loader, skid steer
  • Structural Analysis: Load Factor analysis using MDX software; adequacy confirmed for the 87-kip excavator; lead-paint precautions; road closure with traffic detour

Services Provided

Demolition Engineering

Primary Discipline

Research and Testing

Categories

Ready to work together?