Tampa International Airport Administrative Building Demolition
Tampa, FL · 2022
- Client
- Milburn Demolition
- Owner
- Milburn Demolition
- Location
- Tampa, FL
- Year
- 2022
Project Overview
Description
Demolition engineering for the administrative building at Tampa International Airport, requiring careful coordination with active airport operations.
HBM's Scope
Scope of Work
- Demolition procedure development
- Operational coordination
- Structural sequencing analysis
- 2-story building, approximately 450' x 120', partially removed; 4.5" lightweight reinforced concrete slab, reinforced concrete joists, composite steel beams
- Lot data: length 450'-0", width 120'-0". Building data: built 1968 and 2003; two-story; approximate area 54,000 SF
- Demolition procedure: adherence to the Milburn Site-Specific Safety Plan and OSHA; protection of the main airport building with hand separation; a Lull 1044C-54 to hoist equipment to the 2nd story; metal-deck roof removed with small equipment and robots; shoring towers on the ground floor; saw-cutting of slabs and beams; crane/rigging for spandrel beams
Services Provided
Demolition Engineering